Flowserve BP Manuale Utente Pagina 26

  • Scaricare
  • Aggiungi ai miei manuali
  • Stampa
  • Pagina
    / 44
  • Indice
  • SEGNALIBRI
  • Valutato. / 5. Basato su recensioni clienti
Vedere la pagina 25
BP USER INSTRUCTIONS ENGLISH 85392725 10-09 (E)
Page 26 of 44 flowserve.com
the original design specification (modification or use
of a non-standard part) will invalidate the pump’s
safety certification.
6.3.2 Storage of spares
Spares should be stored in a clean dry area away
from vibration. Inspection and re-treatment of
metallic surfaces (if necessary) with preservative is
recommended at 6 monthly intervals.
6.4 Recommended spares
The list below outlines the minimum requirement for
spare parts to be retained onsite.
The minimum number of spare parts which should be
carried in stock at the site of the installation, should
be determined based on the severity of the condition
of service, the extent to which repairs can be carried
out in the field and number of units installed
No. NAME OF PARTS REQUIRED REPLACEMENT
1 Diffuser rings and
Stage piece rings
When he original clearance has
doubled.
Or
When there is a significant drop
of pump performance.
2 Gaskets Every overhaul
3 “O”rings Every overhaul
4 Shaft sleeve and
Breakdown bushing
When he original clearance has
doubled.
Or
When leakage from shaft
sealing becomes unacceptable.
5 Bearing Every two years.
Or
When increase of noise or
vibration becomes unacceptable
Or
When abnormal rubbing noise is
detected at the bearing.
6 Balancing drum and
Balancing ring
When the clearance between
the drum and ring has become
1.5 times larger than the original
clearance.
6.5 Tools required
A typical range of tools that will be required to
maintain these pumps is listed below.
Readily available in standard tool kits, and dependent
on pump size:
Open ended spanners (wrenches) to suit up to
M36 bolt or nut head
Socket spanners (wrenches), to suit up to M36
bolt or nut head
Range of screwdrivers
Soft mallet
More specialized equipment:
Bearing pullers
Bearing induction heater
Dial test indicator
C-spanner (wrench) - for removing shaft nut.(If
difficulties in sourcing are encountered, consult
Flowserve.)
Coupling grip/shaft spanner
All additional special tools are described in the
Special Tools List and are supplied with your pump.
No Name Remark
Journal
Bearing
Ball
Bearing
1
Extension
Sleeve
Assembly of
Rotor
2 Lifting Lug
Diffuser of
Rotor
Element
3 Lifting Lug
Shaft of
Rotor
Element
4 Shaft Lug Shaft
5
Face Spanner
Wrench
Coupling Nut
6 Belt Wrench Turning
7
Lock Nut
Wrench
Thrust Collar
Nut
8 Hooker
Thrust Collar
Lock Nut
9 Hooker Bearing Nut
1
10 Eye Bolt
Last Stage
Diffuser
11 Eye Bolt Stage Piece
12 Eye Bolt Diffuser
2
2
13 Lifting Jig Diffuser
3
3
14 Pulling Jig
Disassembly
of Discharge
Head
15 Fixing Jig
Diffuser of
Rotor
Element
16 Coupling
Assembly of
Rotor
17 Plate
Assembly of
Rotor
18
Center Bolt &
Nut
Assembly of
Rotor
19 Bolt
Assembly of
Rotor
20 Eye Bolt
Balancing
Drum
21 Eye Bolt
Bearing
Housing
22 Sleeve Spirolox Ring
4
4
23 Tool Box
Vedere la pagina 25
1 2 ... 21 22 23 24 25 26 27 28 29 30 31 ... 43 44

Commenti su questo manuale

Nessun commento